8 stages
How we run an engineering project, from survey to support
Every project follows the same eight stages, with a named engineer and a written deliverable at each one, so you always know what has been done and what comes next.
-
01
Consultation
We agree the objective, constraints, timeline and budget range.
You receiveMeeting notes and a list of information we need
-
02
Site survey
Engineers inspect existing systems, drawings and site conditions.
You receiveSurvey report with photos and findings
-
03
Design
Control philosophy, architecture, panel and network design.
You receiveDesign drawings, I/O or points list, specifications
-
04
Proposal
Written scope, BOQ, programme and exclusions.
You receiveFixed-scope proposal you can compare line by line
-
05
Installation
Panels, cabling, devices and programming on site.
You receiveProgress updates and inspection records
-
06
Commissioning
Point-to-point checks, functional tests and witness tests.
You receiveSigned test sheets and commissioning report
-
07
Training
Operator training and handover documents.
You receiveAs-built drawings, programs, manuals, training record
-
08
Support
Maintenance, upgrades and remote assistance.
You receiveMaintenance plan and service reports
Before we start
What we need from you
A quote is only as good as the information behind it. If you can share these, the survey is shorter and the proposal is firmer. If some are missing, we collect them during the survey.
- 01
Drawings
Architectural and MEP drawings, or as-builts for an existing building.
- 02
Specification or BOQ
The consultant specification, points list or bill of quantities, if there is one.
- 03
Existing system details
Brands, controller models and software versions, plus photos of panels and plant rooms.
- 04
Programme and access
Your target dates, working hours, shutdown windows and site access rules.
- 05
Approvals
Which authority or consultant approvals apply, so documents are prepared in the right format.
- 06
A single contact
One person on your side who can answer questions and sign off each stage.
FAQ
Questions about our process
See how the stages apply to BMS projects, PLC and SCADA work or a full MEP package.
Can you join a project halfway through?
Yes. We often take over packages that another contractor started. We begin with a survey of what is installed and documented, then agree what needs to be finished, corrected or retested before handover.
Do you only do the full package?
No. You can hire us for one stage, for example design and submittals, programming, or testing and commissioning only. The stages and deliverables stay the same; the scope is simply smaller.
Who witnesses the tests?
Usually the consultant or the client’s engineer. We share the test sheets in advance, run the tests together on site, and both sides sign the records.
What happens after handover?
You keep the drawings, programs and manuals. Most clients also take an annual maintenance contract (AMC) covering planned visits, backups and breakdown support.
Request a proposal
Have a technical challenge? Talk to our engineers.
Tell us what you are building, upgrading or troubleshooting. An engineer reads every brief and replies with the next step.
- Call+971 50 994 3349
- WhatsApp+971 50 994 3349
- Emailinfo@synthronix.org
- OfficeOffice 501, Al Barsha Rd, Al Barsha First, Al Barsha, Dubai
- HoursMon–Fri, 8:00 AM – 6:00 PM (GST)