Industrial Automation
Industrial automation contractor in Dubai: PLC, SCADA and control panels
Synthronix designs, programs, installs and commissions PLC, SCADA and VFD systems for factories, utilities and pumping stations across Dubai and the UAE. The same engineers handle design, installation, commissioning and support, so you deal with one team from the first site visit to the last software backup.
1
engineering team from submittals and installation to commissioning and AMC
7
emirates covered from our Dubai office in Al Barsha
Overview
Who this service is for
Plants in the UAE rarely start from a blank sheet. You usually have a mix of controllers from different years, a SCADA package nobody wants to touch, and drives that trip in August. We work with what is already installed, document it, and then upgrade, extend or replace it in planned stages so production keeps running.
- Factory and plant managers who need reliable control and fewer unplanned stops
- Main and MEP contractors who need an automation subcontractor for a package
- Utilities, water and district cooling operators running pumping stations
- Consultants who need control philosophy, I/O lists and panel drawings reviewed
Pumping stations get the same approach through our pump control panel and booster pump work. Plants chasing lower power bills usually pair automation with an energy audit, and factory offices often add a building management system for cooling and lighting. Most of our automation work is in Dubai, Abu Dhabi and Sharjah industrial areas.
Common situations
Is this where you are?
-
01
A line stops and nobody can see why
We add alarms, event logging and SCADA trends so the cause of every stop is recorded and visible.
-
02
The PLC is obsolete and spares are hard to find
We migrate the program to a current platform, keep the I/O wiring where possible and test it against the old logic.
-
03
The original programmer is gone and there is no backup
We recover and back up the program, document it and leave the source with you.
-
04
Motors trip or waste power at fixed speed
We size and install VFDs with soft starts, correct protection settings and energy logging.
Recognise one of these? Send photos, drawings or a short description and an engineer will tell you what it takes to fix.
WhatsApp an engineerWhat’s included
Industrial Automation scope of works
Take the full package or only the part you need: design, programming, commissioning or maintenance.
PLC programming & migration
New logic, modifications and migration of obsolete PLCs, written to IEC 61131-3 with commented code and backups handed over.
SCADA & HMI
Operator screens, alarms, trends, reports and remote access, designed so an operator can find a fault in seconds.
VFD programming & troubleshooting
Drive selection, parameter set-up, tuning and network integration, plus fault finding on drives that trip or overheat.
Control panel engineering
New PLC panels, MCC and pumping panels designed to IEC 61439, with FAT before delivery and SAT on site.
Industrial networking & IIoT
PROFINET, EtherNet/IP, Modbus TCP and OPC UA networks, remote monitoring and data collection for dashboards.
Support & AMC
Troubleshooting call-outs, preventive maintenance, program backups and remote support for systems we built and systems we inherited.
What you receive
Documents you keep at handover
Every stage of a Industrial Automation project ends with a record you own, so the system can be maintained or extended by any qualified team, not only by us.
Request a proposal- 01
Functional design specification
Control philosophy, I/O list, alarm list and interlocks agreed before programming starts.
- 02
Panel drawings and panel FAT
Schematics, GA and wiring drawings, plus a factory acceptance test of the panel before delivery.
- 03
Commented PLC and HMI source code
Full, open project files without passwords, with tag descriptions, so any integrator can maintain them.
- 04
Loop checks and SAT records
Signed point-to-point loop checks and site acceptance test sheets for every function.
- 05
As-built drawings and O&M manual
Drawings updated to what was installed, with datasheets, settings and spare parts lists.
- 06
Operator training and backups
Hands-on training for your operators and a dated backup of every controller and HMI.
How we deliver
From survey to handover, in 5 stages
- 01
Site survey
We inspect panels, controllers and field devices, collect existing programs and drawings, and list what is obsolete.
- 02
Control philosophy & design
Functional description, I/O list, architecture and panel drawings, reviewed with your operations team.
- 03
Programming & FAT
PLC and SCADA programming with a factory acceptance test before anything goes to site.
- 04
Installation & commissioning
Loop checks, I/O testing, SAT and a controlled cut-over planned around your production schedule.
- 05
Handover & support
As-built drawings, commented programs, operator training and an agreed support plan.
Standards & protocols
Built to the rules that apply in the UAE
- IEC 61131-3 programming languages for PLCs
- IEC 61439 for low-voltage switchgear and control panel assemblies
- Hardware-independent design: we work with the PLC and SCADA platforms commonly used in UAE plants
- Factory and site acceptance tests (FAT/SAT) documented and signed off
PLCSCADAHMIVFDMCCPROFINETEtherNet/IPModbus TCPOPC UAIIoT
Pricing
What drives the price
We price on scope after a survey or a review of your drawings. These factors move the number most:
- 01Number of I/O points and how many controllers are involved
- 02Whether existing programs and drawings are available or must be recovered
- 03Panel size, enclosure rating and component brands specified
- 04Shutdown windows available for cut-over
- 05SCADA licence size and number of operator stations
Talk to an engineer
Your enquiry goes to an engineer, not a call centre
The engineers who survey, price and commission the work answer enquiries directly from our office in Office 501, Al Barsha Rd, Al Barsha First, Al Barsha, Dubai.
Eng. Saif Alshamsi
+971 50 994 3349info@synthronix.orgEng. Omar Alshamsi
+971 50 877 9177omar@synthronix.orgEng. Abdulaziz Abdulrahman Alshamsi
+971 55 533 4665abdulaziz@synthronix.org
Technology partners
Platforms we work with
Vendor-neutral: we work with the equipment named in your specification, from 46+ manufacturers.
Logos are trademarks of their respective owners and show platforms our engineers work with.
Engineering guides
Read before you specify
-

Industrial automation · 3 min read
PLC vs SCADA vs DCS: how industrial control systems fit together
A PLC controls, SCADA supervises, and a DCS does both inside one engineered system. Here is how to tell which one your plant needs.
-

Industrial automation · 3 min read
PLC migration: how to replace obsolete controllers without a long shutdown
When a PLC is no longer made, every failure becomes a hunt for spare parts. A planned migration removes that risk without stopping production for weeks.
-

Industrial automation · 3 min read
VFD selection for pumps and fans: heat, harmonics and cable length in the UAE
A variable frequency drive that works well in a European catalogue can overheat in a Dubai plant room. These are the checks that keep drives reliable here.
Industrial Automation FAQ
Questions we are asked most
Not covered here? Ask an engineer and we will answer in writing.
How much does PLC programming cost in the UAE?
It depends on the number of I/O points, the complexity of the sequences and whether existing code can be reused. After a short survey we give a fixed price for the scope, so you know the cost before work starts.
Can you upgrade an obsolete PLC without stopping production?
Usually yes. We prepare and test the new program offline and run the FAT first. The switch-over then happens in a planned shutdown, often a weekend or night shift, with the old system kept ready as a fallback.
Do you work on PLCs and drives from any brand?
Yes. We are vendor-neutral and work with the PLC, HMI, SCADA and VFD platforms commonly installed in UAE factories and utilities. Where hardware is obsolete, we recommend a replacement based on spares availability and your maintenance team.
Do you build control panels?
Yes. We design and build PLC, MCC and pumping panels to IEC 61439, carry out a factory acceptance test with you before delivery, and then install, wire and commission them on site.
Can you support a system another company installed?
Yes. We start by backing up the existing programs, documenting the system and fixing urgent faults. From there we can take over routine support or plan an upgrade.
Related services
Often delivered together
Get a quote
Tell us about your Industrial Automation project
Share drawings, a BOQ, a points list or photos of the existing system. An engineer reviews it and replies with the next step, usually within one business day.
- Call+971 50 994 3349
- WhatsApp+971 50 994 3349
- Emailinfo@synthronix.org
- OfficeOffice 501, Al Barsha Rd, Al Barsha First, Al Barsha, Dubai
- HoursMon–Fri, 8:00 AM – 6:00 PM (GST)



