Serving SAIF Zone
Warehouse automation, BMS and ELV in SAIF Zone
Synthronix supports warehouses, light manufacturers and offices in the Sharjah Airport International Free Zone (SAIF Zone) with BMS, CCTV, access control, control panels and pump systems.
Working in SAIF Zone
What projects in SAIF Zone need from us.
SAIF Zone sits next to Sharjah International Airport and hosts warehouses, light manufacturing, trading companies and offices in ready-built units. Tenants usually inherit the building systems and want to adapt them quickly: more cameras, controlled access, better cooling control or a new machine panel.
Because units are leased, solutions need to be practical and well documented. We design systems that fit the tenant’s operation and the landlord’s rules, and we hand over drawings and settings so the next maintenance visit is straightforward.
Tenants in SAIF Zone typically need CCTV and access control, BMS for cooling and lighting and control panels.
Local rules we design for
We plan for these requirements from the first drawing. Approvals are obtained through the licensed parties your project requires.
- 01Free zone authority approvals and NOCs
- 02SEWA utility requirements
- 03Sharjah Civil Defence approvals
Services in SAIF Zone
What we deliver in SAIF Zone.
The main services for projects in SAIF Zone, with the other disciplines listed below.
-
ELV Systems in SAIF ZoneCCTV · Access · Cabling
-
Building Management Systems in SAIF ZoneBMS · BACnet · HVAC
-
Industrial Automation in SAIF ZonePLC · SCADA · VFD
Also available in SAIF Zone: Home Automation, Energy Audit & Management, Pump Systems & Water, MEP Engineering.
Areas covered
Where we work in SAIF Zone.
Not on the list? We cover the whole emirate. Send your location and we will confirm the visit.
Industrial
- SAIF Zone warehouses
- SAIF Zone light industrial units
Commercial
- SAIF Zone executive offices
Can you install CCTV in a leased warehouse?
Yes. We design coverage for the tenant’s needs and coordinate with the landlord and free zone requirements.
Do you work with free zone approval processes?
Yes. We prepare the documents contractors are typically asked for and coordinate access and permits with the tenant.
Can you add a control panel for a new machine?
Yes. We design, build and commission machine and process control panels.
Other locations
Nearby locations.
- Contractor in SharjahSharjah Industrial Area · Al Sajaa Industrial · SAIF Zone
- Contractor in Sharjah Industrial AreaIndustrial Area 1 to 6 · Industrial Area 10 to 18 · Al Sajaa Industrial Area
- Contractor in Hamriyah Free ZoneHamriyah Free Zone plots · Hamriyah port-side facilities · Al Hamriyah industrial areas
- Contractor in Khor FakkanKhor Fakkan port area
- Contractor in KalbaKalba town centre · Coastal hospitality projects
- Contractor in DubaiJebel Ali & JAFZA · Dubai Investments Park · Al Quoz
- Contractor in Abu DhabiMussafah (ICAD) · KIZAD · Al Ain Industrial Area
- Contractor in AjmanAjman Industrial Area 1 & 2 · Ajman Free Zone · Al Jurf Industrial
Project in SAIF Zone
Planning a project in SAIF Zone?
Send the location, drawings or photos of the existing system. An engineer will confirm the scope and arrange a site visit.
- Call+971 50 994 3349
- WhatsApp+971 50 994 3349
- Emailinfo@synthronix.org
- OfficeOffice 501, Al Barsha Rd, Al Barsha First, Al Barsha, Dubai
- HoursMon–Fri, 8:00 AM – 6:00 PM (GST)
